Technical Support

Comprehensive technical support for laboratory gas systems including installation guides and manuals.

What safety considerations should be taken when installing laboratory gas line check valves?

- FAQ

Lab gas line check valve installation requires flow direction alignment, pressure matching (cracking ≤0.02MPa), and gas-compatible designs (oxygen-clean, anti-static).

How to select the correct gas tube for laboratory low-pressure gas lines (≤0.5MPa)?

- FAQ

PTFE-lined stainless steel hoses or PU tubes are suitable for lab low-pressure gas lines (≤0.5MPa), avoiding PVC tubes.

Why is it necessary to use double-ended bulkhead unions for laboratory gas line wall penetrations?

- FAQ

Double-ended bulkhead unions ensure sealing, pipe alignment, and easy maintenance for lab gas line wall penetrations.

What are the key installation requirements for laboratory gas line filters?

- FAQ

Lab gas line filters (0.2μm pore size) install downstream of relief valves, with regular element replacement every 3-6 months.

[!--temp.left--]